113. Ravi and Kumar are working on an assignment. Ravi takes 6 hours to type 32 pages on a computer, while Kumar takes 5 hours to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 110 pages?

[A]. 7 hours 30 minutes
[B]. 8 hours
[C]. 8 hours 15 minutes
[D]. 8 hours 25 minutes
✅ The correct answer is option C.
Number of pages typed by Ravi in 1 hour =
32
=
16
.

6
3

Number of pages typed by Kumar in 1 hour =
40
= 8.

5

Number of pages typed by both in 1 hour =

16
+ 8

=
40
.

3
3

Time taken by both to type 110 pages =

110 x
3

hours

40

= 8
1
hours (or) 8 hours 15 minutes.

4

116. A is 30% more efficient than B. How much time will they, working together, take to complete a job which A alone could have done in 23 days?

[A]. 11 days
[B]. 13 days
[C].20 3 days 17
[D]. None of these
✅ The correct answer is option B.
Ratio of times taken by A and B = 100 : 130 = 10 : 13.
Suppose B takes x days to do the work.

Then, 10 : 13 :: 23 : x         x =

23 x 13

        x =
299
.

10
10

A’s 1 day’s work =
1
;

23

B’s 1 day’s work =
10
.

299

(A + B)’s 1 day’s work =

1
+
10

=
23
=
1
.

23
299
299
13

Therefore, A and B together can complete the work in 13 days.

117. A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in :

[A]. 8 days
[B]. 10 days
[C]. 12 days
[D]. 15 days
✅ The correct answer is option C.
(A + B)’s 1 day’s work =

1
+
1

=
1
.

15
10
6

Work done by A and B in 2 days =

1
x 2

=
1
.

6
3

Remaining work =

1 –
1

=
2
.

3
3

Now,
1
work is done by A in 1 day.

15

2
work will be done by a in

15 x
2

= 10 days.

3
3

Hence, the total time taken = (10 + 2) = 12 days.

118. A is thrice as good as workman as B and therefore is able to finish a job in 60 days less than B. Working together, they can do it in:

[A]. 20 days
[B]. 22 1 days 2
[C]. 25 days
[D]. 30 days
✅ The correct answer is option B.
Ratio of times taken by A and B = 1 : 3.

The time difference is (3 – 1) 2 days while B take 3 days and A takes 1 day.

If difference of time is 2 days, B takes 3 days.

If difference of time is 60 days, B takes

3
x 60

= 90 days.

2

So, A takes 30 days to do the work.

A’s 1 day’s work =
1

30

B’s 1 day’s work =
1

90

(A + B)’s 1 day’s work =

1
+
1

=
4
=
2

30
90
90
45

A and B together can do the work in
45
= 22
1
days.

2
2

119. If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be:

[A]. 4 days
[B]. 5 days
[C]. 6 days
[D]. 7 days
✅ The correct answer is option A.
Let 1 man’s 1 day’s work = x and 1 boy’s 1 day’s work = y.

Then, 6x + 8y =
1
and 26x + 48y =
1
.

10
2

Solving these two equations, we get : x =
1
and y =
1
.

100
200

(15 men + 20 boy)’s 1 day’s work =

15
+
20

=
1
.

100
200
4

15 men and 20 boys can do the work in 4 days.