[A]. estimation of the percentage utilisation of machine tools
[B]. estimating the percentage of the time consumed by various job activities
[C]. finding out time standards, specially where the job is not repetitive and where time study by stop watch method is not possible
[D]. all of the above
✅ The correct answer is option D.