The routing function in a production system design is concerned with September 14, 2025 by Admin [A]. manpower utilisation [B]. quality assurance of the product [C]. machine utilisation [D]. optimising material flow through the plant ✅ The correct answer is option C.
In order to avoid excessive multiplication of facilities, the layout preferred is September 14, 2025 by Admin [A]. product layout [B]. process layout [C]. group layout [D]. static layout ✅ The correct answer is option B.
String diagram is used September 14, 2025 by Admin [A]. for checking the relative values of various layouts [B]. when a group of workers are working at a place [C]. where processes require the operator to be moved from one work place to another [D]. all of the above ✅ The correct answer is option D.
In value engineering, the term value refers to September 14, 2025 by Admin [A]. manufacturing cost of the product [B]. selling price of the product [C]. total cost of the product [D]. utility of the product ✅ The correct answer is option D.
The type of organisation preferred for a steel industry, is September 14, 2025 by Admin [A]. line organisation [B]. functional organisation [C]. line and staff organisation [D]. line, staff and functional organisation ✅ The correct answer is option D.
The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organisation and control of their work, is termed as September 14, 2025 by Admin [A]. job enlargement [B]. job enrichment [C]. job rotation [D]. job evaluation ✅ The correct answer is option B.
Simplex method is the method used for September 14, 2025 by Admin [A]. value analysis [B]. network analysis [C]. linear programming [D]. queuing theory ✅ The correct answer is option C.
The chart which gives an estimate about the amount of materials handling between various work stations is known as September 14, 2025 by Admin [A]. flow chart [B]. process chart [C]. travel chart [D]. operation chart ✅ The correct answer is option C.
If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be September 14, 2025 by Admin [A]. TR [B]. [C]. TR + (S – T)R [D]. ✅ The correct answer is option D.
Line organisation is suitable for a big organisation. September 14, 2025 by Admin [A]. Correct [B]. Incorrect null null ✅ The correct answer is option B.