HomeEngineeringThe expected out turn of cement concrete 1 : 2 : 4 per mason per day is_________________? 1580. The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_________________?By Admin / September 7, 2025 A. 1.5 m 3 B. 2.5 m3 C. 3.5 m3 D. 5.0 m3 ✅ The correct answer is option D.