1. The area of the cross-section of a road fully in banking shown in the given figure, is________________? September 7, 2025 by Admin A. [sb² + r² (2bd + sd)²]/(r² – s²) B. [sb² + r² (2bd + sd)²]/(r² – s5) C. [sb² + r² (2bd + sd)²]/(r – s) D. None of these ✅ The correct answer is option A.
2. The order of booking dimensions is________________? September 7, 2025 by Admin A. Length, breadth, height B. Breadth, length, height C. Height, breadth, length D. None of these ✅ The correct answer is option A.
3. The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________? September 7, 2025 by Admin A. b – rd)²/(r – s) B. b – rd)²/(r + s) C. ½ × (b + rd)²/(r – s) D. b – rd)²/(s – r) ✅ The correct answer is option A.
4. Brick walls are measured in sq. m if the thickness of the wall is_________________? September 7, 2025 by Admin A. 10 cm B. 15 cm C. 20 cm D. None of these ✅ The correct answer is option A.
5. The volume is measured correct to the nearest__________________? September 7, 2025 by Admin A. 0.01 cum B. 0.02 cum C. 0.03 cum D. 0.04 cum ✅ The correct answer is option A.
6. The most reliable estimate is_________________? September 7, 2025 by Admin A. Detailed estimate B. Preliminary estimate C. Plinth area estimate D. Cube rate estimate ✅ The correct answer is option A.
7. The correct Prismoidal formula for volume is________________? September 7, 2025 by Admin A. D [first area + last area + Even area + 2 odd areas] B. D/3 [first area + last area + 4 Even area + 2 odd areas] C. D/3 [first area + last area + 2 Even area + 4 odd areas] D. D/6 [first area + odd areas] ✅ The correct answer is option B.
8. period in a septic tank is assumed___________________? September 7, 2025 by Admin The detention A. 20 minutes B. 25 minutes C. 30 minutes ✅ The correct answer is option C.
9. The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is____________________? September 7, 2025 by Admin A. 3250 m3 B. 3225 m3 C. 3275 m3 D. 3300 m3 ✅ The correct answer is option B.
10. The floor area includes the area of the balcony up to_________________? September 7, 2025 by Admin A. 100 % B. 75 % C. 50 % D. 25 % ✅ The correct answer is option C.