HomeEngineeringThe expected out turn of 12 mm plastering with cement mortar is_______________? 1623. The expected out turn of 12 mm plastering with cement mortar is_______________?By Admin / September 7, 2025 A. 2.5 sq m B. 4.0 sq m C. 6.0 sq m D. 8.0 sq m ✅ The correct answer is option D.