HomeEngineeringThe cross -sections for a highway is taken at_________________? 1612. The cross -sections for a highway is taken at_________________?By Admin / September 7, 2025 A. Right angle to the centre line B. 30 metres apart C. Intermediate points having abrupt change in gradient D. All the above ✅ The correct answer is option D.
1. A fire tube boiler is limited to a maximum steam pressure of about __________ kg/cm². Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin
2. Transformer cores are normally made from Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin