Skip to content

GetMCQs

  • Home
  • Quiz
  • All MCQs
  • Aptitude
    • Height-and-Distance
    • series
    • Time and Distance
    • Time and Work
    • Train
  • Art
    • Accounting
    • Business and Commerce
    • Costing
    • eCommerce
    • Economics
    • Financial Management
    • GST
    • Insurance
  • Computer
    • Basics of Computer Science MCQs
    • Operating System
    • MS Office
      • MS Word MCQs
      • MS Excel MCQs
      • MS PowerPoint MCQs
  • Engineering
    • Chemical Engineering
    • Environmental Engineering MCQs
    • Civil Engineering
    • Electrical Engineering
    • Mechanical Engineering
    • Software Engineering MCQs
  • English
  • Physics MCQs
  • Chemistry
  • Biology
  • General Knowledge
  • Everyday Science

Industrial Engineering and Production Management MCQs

In CPM, the cost slope is determined by

September 14, 2025 by Admin
✅ The correct answer is option B.
Categories Engineering, Industrial Engineering and Production Management MCQs, Mechanical Engineering Tags Engineering MCQs, Industrial Engineering and Production Management MCQs, Mechanical Engineering MCQs Leave a comment

PERT analysis is based upon

September 14, 2025 by Admin
optimistic time
pessimistic time
most likely time
all of these
✅ The correct answer is option D.
Categories Engineering, Industrial Engineering and Production Management MCQs, Mechanical Engineering Tags Engineering MCQs, Industrial Engineering and Production Management MCQs, Mechanical Engineering MCQs Leave a comment

Which of the following type of layout is suitable for automobile manufacturing concern?

September 14, 2025 by Admin
product layout
process layout
fixed position layout
combination layout
✅ The correct answer is option A.
Categories Engineering, Industrial Engineering and Production Management MCQs, Mechanical Engineering Tags Engineering MCQs, Industrial Engineering and Production Management MCQs, Mechanical Engineering MCQs Leave a comment

Military type of organisation is known as

September 14, 2025 by Admin
line organisation
functional organisation
line and staff organisation
line, staff and functional organisation
✅ The correct answer is option A.
Categories Engineering, Industrial Engineering and Production Management MCQs, Mechanical Engineering Tags Engineering MCQs, Industrial Engineering and Production Management MCQs, Mechanical Engineering MCQs Leave a comment

Bar chart is suitable for

September 14, 2025 by Admin
large project
major work
minor work
all of these
✅ The correct answer is option C.
Categories Engineering, Industrial Engineering and Production Management MCQs, Mechanical Engineering Tags Engineering MCQs, Industrial Engineering and Production Management MCQs, Mechanical Engineering MCQs Leave a comment

In a network shown in the below figure, the critical path is along

September 14, 2025 by Admin
1-2-3-4-8-9
1-2-3-5-6-7-8-9
1-2-3-4-7-8-9
1-2-5-6-7-8-9
✅ The correct answer is option B.
Categories Engineering, Industrial Engineering and Production Management MCQs, Mechanical Engineering Tags Engineering MCQs, Industrial Engineering and Production Management MCQs, Mechanical Engineering MCQs Leave a comment

The determination of standard time in a complex job system is best done through

September 14, 2025 by Admin
stop watch time study
analysis of micromotions
grouping timing technique
analysis of standard data system
✅ The correct answer is option D.
Categories Engineering, Industrial Engineering and Production Management MCQs, Mechanical Engineering Tags Engineering MCQs, Industrial Engineering and Production Management MCQs, Mechanical Engineering MCQs Leave a comment

Which one of the following chart gives simultaneously information about the progress of work and machine loading?

September 14, 2025 by Admin
Process chart
Machine load chart
Man-machine chart
Gantt chart
✅ The correct answer is option C.
Categories Engineering, Industrial Engineering and Production Management MCQs, Mechanical Engineering Tags Engineering MCQs, Industrial Engineering and Production Management MCQs, Mechanical Engineering MCQs Leave a comment

A diagram showing the path followed by men and materials while performing a task is known as

September 14, 2025 by Admin
string diagram
flow process chart
travel chart
flow diagram
✅ The correct answer is option D.
Categories Engineering, Industrial Engineering and Production Management MCQs, Mechanical Engineering Tags Engineering MCQs, Industrial Engineering and Production Management MCQs, Mechanical Engineering MCQs Leave a comment

A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called

September 14, 2025 by Admin
hoist
jib crane
portable elevator
chain conveyor
✅ The correct answer is option A.
Categories Engineering, Industrial Engineering and Production Management MCQs, Mechanical Engineering Tags Engineering MCQs, Industrial Engineering and Production Management MCQs, Mechanical Engineering MCQs Leave a comment
Older posts
Newer posts
← Previous Page1 Page2 Page3 Page4 … Page16 Next →
GetMCQs:

  

  

  • Arts Subjects MCQs
  • Aptitude MCQs
  • Biology
  • Chemistry
  • English
  • Everyday Science
  • General Knowledge
  • Pedagogy
  • Psychology
  • Physics
  • Punjab Public Service Commission (PPSC) - Past Papers
  • Sociology

  

  • Chemical Engineering
  • Civil Engineering
  • Environmental Engineering
  • Mechanical Engineering
  • Software Engineering
  • Electrical Engineering

  

  • All Computer MCQs
  • Basics of Computer Science
  • Operating System
  • MS Word
  • MS Excel
  • MS PowerPoint

MCQs

Antonyms MCQs Art Basic Chemical Engineering MCQs Basic General Knowledge MCQs Basics of Computer Science MCQs Chemical Engineering Chemical Process MCQs Civil Engineering Civil Engineering Mcqs MCQs Common Error Detection MCQs Computer Costing Engineering English Environmental Science MCQs Everyday Science MCQs Financial Management Fluid Mechanics MCQs General Anatomy Mcqs General Knowledge GK Idioms And Phrases MCQs Insurance International Finance and Treasury MCQs Islamic Studies Machine Design MCQs Management Mass Transfer MCQs Mechanical Engineering Medical Microbiology MCQs MS Office One Word Substitution MCQs Operating System Physiology Mcqs PPSC Past Papers Related Pair of Words MCQs Sentence Completion MCQs Software Engineering MCQs Sports MCQs SSC Synonyms MCQs Theory of machines MCQs Thermodynamics MCQs UPSC
© 2026 GetMCQs • Built with GeneratePress