The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________? September 7, 2025 by Admin A. Rs. 400 B. Rs. 425 C. Rs. 450 D. Rs. 500 ✅ The correct answer is option C.
The area of the cross-section of a road fully in banking shown in the given figure, is________________? September 7, 2025 by Admin A. [sb² + r² (2bd + sd)²]/(r² – s²) B. [sb² + r² (2bd + sd)²]/(r² – s5) C. [sb² + r² (2bd + sd)²]/(r – s) D. None of these ✅ The correct answer is option A.
The order of booking dimensions is________________? September 7, 2025 by Admin A. Length, breadth, height B. Breadth, length, height C. Height, breadth, length D. None of these ✅ The correct answer is option A.
The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________? September 7, 2025 by Admin A. b – rd)²/(r – s) B. b – rd)²/(r + s) C. ½ × (b + rd)²/(r – s) D. b – rd)²/(s – r) ✅ The correct answer is option A.
Brick walls are measured in sq. m if the thickness of the wall is_________________? September 7, 2025 by Admin A. 10 cm B. 15 cm C. 20 cm D. None of these ✅ The correct answer is option A.
The volume is measured correct to the nearest__________________? September 7, 2025 by Admin A. 0.01 cum B. 0.02 cum C. 0.03 cum D. 0.04 cum ✅ The correct answer is option A.
The most reliable estimate is_________________? September 7, 2025 by Admin A. Detailed estimate B. Preliminary estimate C. Plinth area estimate D. Cube rate estimate ✅ The correct answer is option A.