Skip to content

GetMCQs

  • Home
  • Quiz
  • All MCQs
  • Aptitude
    • Height-and-Distance
    • series
    • Time and Distance
    • Time and Work
    • Train
  • Art
    • Accounting
    • Business and Commerce
    • Costing
    • eCommerce
    • Economics
    • Financial Management
    • GST
    • Insurance
  • Computer
    • Basics of Computer Science MCQs
    • Operating System
    • MS Office
      • MS Word MCQs
      • MS Excel MCQs
      • MS PowerPoint MCQs
  • Engineering
    • Chemical Engineering
    • Environmental Engineering MCQs
    • Civil Engineering
    • Electrical Engineering
    • Mechanical Engineering
    • Software Engineering MCQs
  • English
  • Physics MCQs
  • Chemistry
  • Biology
  • General Knowledge
  • Everyday Science

Estimating and Costing MCQs

The damp proof course (D.P.C.) is measured in________________?

September 7, 2025 by Admin
A. Cub. m
B. Sq. m
C. Metres
D. None of these
✅ The correct answer is option B.
Categories Civil Engineering, Engineering, Estimating and Costing MCQs Tags Civil Engineering MCQs, Engineering MCQs, Estimating and Costing MCQs Leave a comment

The expected out turn for earth work in excavation in ordinary soil per workman per day is_______________?

September 7, 2025 by Admin
A. 1.00 cum
B. 2.00 cum
C. 3.00 cum
D. 4.00 cum
✅ The correct answer is option C.
Categories Civil Engineering, Engineering, Estimating and Costing MCQs Tags Civil Engineering MCQs, Engineering MCQs, Estimating and Costing MCQs Leave a comment

Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?

September 7, 2025 by Admin
A. 2.0 %
B. 2.5 %
C. 4.0 %
D. 5.0 %
✅ The correct answer is option D.
Categories Civil Engineering, Engineering, Estimating and Costing MCQs Tags Civil Engineering MCQs, Engineering MCQs, Estimating and Costing MCQs Leave a comment

The item of the brick structure measured in sq.m, is___________________?

September 7, 2025 by Admin
A. Reinforced brick work
B. Broken glass coping
C. Brick edging
D. Brick work in arches
✅ The correct answer is option B.
Categories Civil Engineering, Engineering, Estimating and Costing MCQs Tags Civil Engineering MCQs, Engineering MCQs, Estimating and Costing MCQs Leave a comment

The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?

September 7, 2025 by Admin
A. 2.5 sqm
B. 5.0 sqm
C. 7.5 sqm
D. 10 sqm
✅ The correct answer is option C.
Categories Civil Engineering, Engineering, Estimating and Costing MCQs Tags Civil Engineering MCQs, Engineering MCQs, Estimating and Costing MCQs Leave a comment

In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and_________________?

September 7, 2025 by Admin
A. Breadth of the wall
B. Half breadth of wall on each side
C. One fourth breadth of wall on each side
D. None of these
✅ The correct answer is option B.
Categories Civil Engineering, Engineering, Estimating and Costing MCQs Tags Civil Engineering MCQs, Engineering MCQs, Estimating and Costing MCQs Leave a comment

Anti-siphonage pipe is connected to__________________?

September 7, 2025 by Admin
A. Main soil pipe
B. Bottom of P trap W.C.
C. Top of P trap W.C.
D. Side of water closet
✅ The correct answer is option C.
Categories Civil Engineering, Engineering, Estimating and Costing MCQs Tags Civil Engineering MCQs, Engineering MCQs, Estimating and Costing MCQs Leave a comment

For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?

September 7, 2025 by Admin
A. 0.90 m3
B. 0.94 m3
C. 0.98 m3
D. 1.00 m3
✅ The correct answer is option B.
Categories Civil Engineering, Engineering, Estimating and Costing MCQs Tags Civil Engineering MCQs, Engineering MCQs, Estimating and Costing MCQs Leave a comment

For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?

September 7, 2025 by Admin
A. 0.200 m3
B. 0.247 m3
C. 0.274 m3
D. 0.295 m3
✅ The correct answer is option C.
Categories Civil Engineering, Engineering, Estimating and Costing MCQs Tags Civil Engineering MCQs, Engineering MCQs, Estimating and Costing MCQs Leave a comment

The minimum width of a septic tank is taken__________________?

September 7, 2025 by Admin
A. 70 cm
B. 75 cm
C. 80 cm
D. 90 cm
✅ The correct answer is option B.
Categories Civil Engineering, Engineering, Estimating and Costing MCQs Tags Civil Engineering MCQs, Engineering MCQs, Estimating and Costing MCQs Leave a comment
Older posts
Newer posts
← Previous Page1 … Page6 Page7 Page8 Next →
GetMCQs:

  

  

  • Arts Subjects MCQs
  • Aptitude MCQs
  • Biology
  • Chemistry
  • English
  • Everyday Science
  • General Knowledge
  • Pedagogy
  • Psychology
  • Physics
  • Punjab Public Service Commission (PPSC) - Past Papers
  • Sociology

  

  • Chemical Engineering
  • Civil Engineering
  • Environmental Engineering
  • Mechanical Engineering
  • Software Engineering
  • Electrical Engineering

  

  • All Computer MCQs
  • Basics of Computer Science
  • Operating System
  • MS Word
  • MS Excel
  • MS PowerPoint

MCQs

Antonyms MCQs Art Basic Chemical Engineering MCQs Basic General Knowledge MCQs Basics of Computer Science MCQs Chemical Engineering Chemical Process MCQs Civil Engineering Civil Engineering Mcqs MCQs Common Error Detection MCQs Computer Costing Engineering English Environmental Science MCQs Everyday Science MCQs Financial Management Fluid Mechanics MCQs General Anatomy Mcqs General Knowledge GK Idioms And Phrases MCQs Insurance International Finance and Treasury MCQs Islamic Studies Machine Design MCQs Management Mass Transfer MCQs Mechanical Engineering Medical Microbiology MCQs MS Office One Word Substitution MCQs Operating System Physiology Mcqs PPSC Past Papers Related Pair of Words MCQs Sentence Completion MCQs Software Engineering MCQs Sports MCQs SSC Synonyms MCQs Theory of machines MCQs Thermodynamics MCQs UPSC
© 2026 GetMCQs • Built with GeneratePress