91. Which model is used during early stages of the system design after the requirements have been established ?

A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model
✅ The correct answer is option D.
Explanation: Estimates are based on function points, which are then converted to number of lines of source code. The formula follows the standard form discussed above with a simplified set of seven multipliers.

92. SPMP stands for__________________?

A. Software Project Manager’s Plan
B. Software Project Management Plan
C. Software Product Management Plan
D. Software Product Manager’s Plan
✅ The correct answer is option B.
Explanation: After planning is complete, documenting of the plans is done in a Software Project Management Plan(SPMP) document.

93. Risk management is one of the most important jobs for a__________________?

A. Client
B. Investor
C. Production team
D. Project manager
✅ The correct answer is option D.
Explanation: Risk management involves anticipating risks that might affect the project schedule or the quality of the software being developed, and then taking action to avoid these risks.

97. Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?

A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned
✅ The correct answer is option C.

99. Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools ?

A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model
✅ The correct answer is option C.