4034. The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing.
1-May
20-40
100-150
1000-1500
✅ The correct answer is option B.