HomeEngineeringIn the allocated cap area, bubble caps are generally arranged on equilateral triangular pitch. Number of caps fixed on a plate is with a 4035. In the allocated cap area, bubble caps are generally arranged on equilateral triangular pitch. Number of caps fixed on a plate is with aBy Admin / September 7, 2025 clearance of 25-75 mm. cap pitch of 1.3-2 times the cap diameter. either ‘a’ or ‘b’. neither ‘a’ nor ‘b’. ✅ The correct answer is option C.