4034. The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing.

1-May
20-40
100-150
1000-1500
✅ The correct answer is option B.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top