HomeEngineeringThe net head under which the turbine reaches its peak efficiency at synchronous speed is called________________? 1886. The net head under which the turbine reaches its peak efficiency at synchronous speed is called________________?By Admin / September 7, 2025 A. design head B. rated head C. gross head D. operating head ✅ The correct answer is option A.