$40,000
$60,000
$52,000
$20,000
✅ The correct answer is A.
Direct material cost = Prime cost – Direct manufacturing labour
= $50000 – $10000 = $40,000
Direct material cost = Prime cost – Direct manufacturing labour
= $50000 – $10000 = $40,000