Industrial Engineering and Production Management MCQs

51. Travel charts are used to

analyse material handling
determine inventory control difficulties
plan material handling procedure and routes
all of the above
✅ The correct answer is option D.

52. Work study is mainly aimed at

determining the most efficient method of performing a job
establishing the minimum time of completion of a job
developing the standard method and standard time of a job
economising the motion
✅ The correct answer is option A.

54. Routing

prescribes the sequence of operations to be followed
determines the programme for the operations
is concerned with starting of processes
regulates the progress
✅ The correct answer is option A.

55. A-B-C analysis

is a basic technique of materials management
is meant for relative inventory control
does not depend upon the unit cost of the item but on its annual consumption
all of the above
✅ The correct answer is option D.

59. In process layout

handling and back-tracking of materials is too much
production control is more difficult and costly
routing and scheduling is more difficult
all of the above
✅ The correct answer is option D.