11. Abbreviated work factor data is applied for material handling operation maintenance operation packing and shipping operation all of these ✅ The correct answer is option D.
12. Product layout is best suited where one type of product is produced product is standardised product is manufactured in large quantities all of the above ✅ The correct answer is option D.
13. The main objective of work measurement is to plan and schedule of production formulate a proper incentive scheme estimate the selling prices and delivery dates all of the above ✅ The correct answer is option D.
14. Dummy activities are used to determine the critical path determine the project completion time maintain the required net work none of these ✅ The correct answer is option C.
15. In jobbing production highly skilled workers are needed unit costs are high operations are labour-intensive all of these ✅ The correct answer is option D.
16. In manufacturing management, the term ‘Dispatching’ is used to describe dispatch of sales order dispatch of factory mail dispatch of finished product of the user dispatch of work order ✅ The correct answer is option D.
17. Generally PERT is preferred over CPM for the purpose of project evaluation. Yes No ✅ The correct answer is option A.
18. Halsey plan of wage incentive is not applied to all level of workers is applied to all level of workers does not guarantee minimum wage is based upon efficien ✅ The correct answer is option B.
19. Both Rowan plan and 50-50 Halsey plan will provide the same earning when the actual time is __________ the standard time. one-fourth one-half equal to twice ✅ The correct answer is option B.
20. P.M.T.S. (Predetermined Motion Time Systems) include M.T.M. (Method Time Measurement) W.F.S. (Work Factor Systems) B.M.T.S. (Basic Motion Time Study) all of these ✅ The correct answer is option D.