2223. In testing a pile by load test, pile platform is loaded with one and half times the design load and a maximum settlement is noted. The load is gradually removed and the consequent rebound is measured. For a safe pile, the net settlement (i.e. total settlement minus rebound) per tonne of test load should not exceed________________?

A. 10 mm
B. 15 mm
C. 20 mm
D. 25 mm
✅ The correct answer is option D.

2230. A pre-stressed concrete member is preferred because___________________?

A. Its dimensions are not decided from the diagonal tensile stress
B. Large size of long beams carrying large shear force need not be adopted
C. Removal of cracks in the members due to shrinkage
D. All the above
✅ The correct answer is option D.