Civil Engineering

Prepare with the latest Civil Engineering MCQs with answers and explanations for exams, interviews, and job tests. Our question bank covers key topics including surveying, building materials, structural engineering, geotechnical engineering, fluid mechanics, hydraulics, transportation engineering, environmental engineering, and construction management. These Civil Engineering multiple-choice questions are designed for students, competitive exam aspirants, and professionals preparing for NTS, PPSC, FPSC, PEC exams, university entry tests, and recruitment assessments. Strengthen your knowledge and problem-solving skills with our updated and comprehensive Civil Engineering MCQs.

2012. Flangeway clearance is the distance_________________?

A. between the adjoining faces of the running rail and the check rail near the crossing
B. between the gauge faces of the stock rail and the tongue rail
C. through which the tongue rail moves laterally at the toe of the switch
D. none of the above
✅ The correct answer is option A.
Scroll to Top