524. Key concept under which technique are network of events and activities , resource allocation, time and cost considerations, network paths and critical paths ?

A. Game Theory
B. Network Analysis
C. Decision Theory
D. None of the above
✅ The correct answer is option B.
Key concept under Network Analysis are network of events and activities , resource allocation, time and cost considerations, network paths and critical paths. Network analysis is any structured technique used to mathematically analyze a circuit (a “network” of interconnected components).