734. In a grit chamber of a sewage treatment plant ____________________? September 7, 2025 by Admin A. Flow velocity 0.15 m to 0.3 m/sec is kept B. Depth of 0.9 m to 1.20 m is kept C. One minute of detention period is kept D. All the above ✅ The correct answer is option D.