656. For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of___________________? September 7, 2025 by Admin A. 100 cm B. 120 cm C. 140 cm D. 160 cm ✅ The correct answer is option D.