HomeEngineeringFor design of sewers, percentage of sewage discharge is assumed_____________________? 578. For design of sewers, percentage of sewage discharge is assumed_____________________?By Admin / September 7, 2025 A. 65 to 70% B. 70 to 75% C. 75 to 80% D. 85% ✅ The correct answer is option C.