133. A and B together can do a piece of work in 30 days. A having worked for 16 days, B finishes the remaining work alone in 44 days. In how many days shall B finish the whole work alone?

[A]. 30 days
[B]. 40 days
[C]. 60 days
[D]. 70 days
✅ The correct answer is option C.
Let A’s 1 day’s work = x and B’s 1 day’s work = y.

Then, x + y =
1
and 16x + 44y = 1.

30

Solving these two equations, we get: x =
1
and y =
1

60
60

B’s 1 day’s work =
1
.

60

Hence, B alone shall finish the whole work in 60 days.