[A].9 1 days 3
[B]. 11 days
[C].12 1 days 4
[D].16 1 days 3
✅ The correct answer is option B.
(A’s 1 day’s work) : (B’s 1 day’s work) =
7
: 1 = 7 : 4.
(A’s 1 day’s work) : (B’s 1 day’s work) =
7
: 1 = 7 : 4.
4
Let A’s and B’s 1 day’s work be 7x and 4x respectively.
Then, 7x + 4x =
1
11x =
1
x =
1
.
7
7
77
A’s 1 day’s work =
1
x 7
=
1
.
77
11