[A]. 4 days
[B]. 6 days
[C]. 8 days
[D]. 18 days
✅ The correct answer is option A.
Ratio of rates of working of A and B = 2 : 1.
So, ratio of times taken = 1 : 2.
Ratio of rates of working of A and B = 2 : 1.
So, ratio of times taken = 1 : 2.
B’s 1 day’s work =
1
.
12
A’s 1 day’s work =
1
; (2 times of B’s work)
6
(A + B)’s 1 day’s work =
1
+
1
=
3
=
1
.
6
12
12
4
So, A and B together can finish the work in 4 days.