18012. Which of the following are the guidelines for the construction of a network diagram? September 14, 2025 by Admin Each activity is represented by one and only one arrow in the network. Dangling must be avoided in a network diagram. Dummy activity consumes no time or resource. all of the above ✅ The correct answer is option D.