HomeEngineeringThe time taken by a trained worker to perform an operation, while working a steady pace, is known as 17299. The time taken by a trained worker to perform an operation, while working a steady pace, is known asBy Admin / September 13, 2025 standard time normal time representative time none of these ✅ The correct answer is option A.