HomeEngineeringPick up the excavation where measurements are made in square metres for payment ? 1601. Pick up the excavation where measurements are made in square metres for payment ?By Admin / September 7, 2025 A. Ordinary cuttings up to 1 m B. Surface dressing up to 15 cm depths C. Surface excavation up to 30 cm depths D. Both B. and C. ✅ The correct answer is option D.
1. A fire tube boiler is limited to a maximum steam pressure of about __________ kg/cm². Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin
2. Transformer cores are normally made from Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin