1597. For the construction of buildings, the subheads of the estimate are________________? September 7, 2025 by Admin A. Earthwork, Concrete work, Brick work B. Brickwork, Stone work, Roofing C. Brickwork Flooring, Wood work, Steel work D. All the above ✅ The correct answer is option D.