HomeEngineeringFor laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of___________________? 656. For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of___________________?By Admin / September 7, 2025 A. 100 cm B. 120 cm C. 140 cm D. 160 cm ✅ The correct answer is option D.
1. A fire tube boiler is limited to a maximum steam pressure of about __________ kg/cm². Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin
2. Transformer cores are normally made from Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin