What are generic application systems that may be designed to support a particular business type, activity, or sometimes a complete enterprise ?

A. COTS-solution systems
B. COTS-integrated systems
C. ERP systems
D. Both COTS-solution and COTS-integrated systems
✅ The correct answer is option A.

The expected value for the estimation variable (size), S, can be computed as a weighted average of the optimistic(Sopt), most likely (Sm), and pessimistic (Spess) estimates given as___________________?

A. EV = (Sopt + 4Sm + Spess)/4
B. EV = (Sopt + 4Sm + Spess)/6
C. EV = (Sopt + 2Sm + Spess)/6
D. EV = (Sopt + 2Sm + Spess)/4
✅ The correct answer is option B.
Explanation: This assumes that there is a very small probability that the actual size result will fall outside the optimistic or pessimistic values.