Which regression test selection technique exposes faults caused by modifications ?

A. Efficiency
B. Precision
C. Generality
D. Inclusiveness
✅ The correct answer is option D.
Explanation: Inclusiveness measures the extent to which a technique chooses test cases that will cause the modified program to produce different output than the original program, and thereby expose faults caused by modifications.

The process each manager follows during the life of a project is known as ___________________?

A. Project Management
B. Manager life cycle
C. Project Management Life Cycle
D. All of the mentioned
✅ The correct answer is option C.
Explanation: A proven methodical life cycle is necessary to repeatedly implement and manage projects successfully.

The intent of project metrics is_____________________?

A. minimization of development schedule
B. for strategic purposes
C. assessing project quality on ongoing basis
D. minimization of development schedule and assessing project quality on ongoing basis
✅ The correct answer is option D.
Explanation: A project metric is a quantitative measure of the degree to which a system, component or process possesses an attribute.

Which one of the following is not a software quality model ?

A. ISO 9000
B. McCall model
C. Boehm model
D. ISO 9126
✅ The correct answer is option A.
Explanation: ISO-9000 series of standards is a set of document dealing with quality systems that can be used for quality assurance purposes.

In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?

A. Software Product Engineering
B. Software Quality Assurance
C. Software Subcontract Management
D. Software Quality Management
✅ The correct answer is option A.
Explanation: In CMM planning these activities is described in Software Project Planning, however the life cycle activities of requirements analysis, design, code, and test are described in Software Product Engineering.