2023. The documentation of a process which records the tasks, the roles and the entities used is called__________________?

A. Process metric
B. Process analysis
C. Process modelling
D. None of the mentioned
✅ The correct answer is option C.
Explanation: Process models may be presented from different perspectives.

2024. The construction of object-oriented software begins with the creation of__________________?

A. design model
B. analysis model
C. code levels
D. both design and analysis model
✅ The correct answer is option D.
Explanation: It is due to the evolutionary nature of the OO software engineering paradigm, these models begin as relatively informal representations of system requirements and evolve into detailed models of classes, class connections and relationships, system design and allocation, and object design.

2025. Which of the following examples does not involve dependability engineering ?

A. Medical Systems
B. Power Systems
C. Library Management
D. Telecommunications
✅ The correct answer is option C.
Explanation: Software customers expect all software to be dependable. However, for non-critical applications such as certain management systems, they may be willing to accept some system failures.

2029. Database management software serves as a foundation for the establishment of a CASE database (repository) that we call__________________?

A. project database
B. system database
C. analysis and design tools
D. prototyping tools
✅ The correct answer is option A.
Explanation: Given the emphasis on configuration objects, database management tools for CASE are evolving from relational database management systems to object oriented database management systems.