111. A specification of how the user moves from window to window, interacting with the application programs to perform useful work is called_______________? September 13, 2025 by Admin A. interface specifications B. software specifications C. user dialog D. prototyping specifications ✅ The correct answer is option C.
112. Which of the following is NOT an advanced input control ? September 13, 2025 by Admin A. radio button B. spin box C. both A and B D. slider edit calendar ✅ The correct answer is option C.
113. An information system that supports the planning and assessment needs of executive management is______________? September 13, 2025 by Admin A. DSS B. TPS C. ERP D. None of these ✅ The correct answer is option D.
114. A cross life-cycle activity of system development is____________________? September 13, 2025 by Admin A. object modeling B. prototyping C. fact-finding D. data modeling ✅ The correct answer is option C.
115. Which of the following is(are) an input process method(s) ? September 13, 2025 by Admin A. smart card B. biometric C. optical mark D. all of the above ✅ The correct answer is option D.
116. MIS is both an area of _________ and a ________ of scholarly inquiry? September 13, 2025 by Admin A. Design, diagnosis B. Practice, discipline C. Evaluation, implementation D. None of these ✅ The correct answer is option A.
117. ___________ expressly designed for the support of individual and collective decision making? September 13, 2025 by Admin A. MIS B. DSS C. TPS D. OIS ✅ The correct answer is option B.
118. A decision support system has a more customized orientation than a _________. _______ is a collection of capabilities that support the decision making process of a individual or a small group of a ind ? September 13, 2025 by Admin A. TPS, TPS B. DSS,TPS C. CSF, DSS D. None of these ✅ The correct answer is option A.
119. Which of the following phases identifies and expresses requirements, prioritizes requirements, updates project plan, and communications the requirements statement ? September 13, 2025 by Admin A. logical design phase B. decisions analysis phase C. problem analysis phase D. none of the above ✅ The correct answer is option D.
120. Project Management ensures that______________? September 13, 2025 by Admin A. project’s risk is assessed B. project’s feasibility is assessed C. system is developed at minimum cost D. both A and B ✅ The correct answer is option C.