Boost your preparation with the latest Engineering MCQs with answers and explanations. Our collection covers civil engineering, electrical engineering, mechanical engineering, electronics, software engineering, and other core subjects. These multiple-choice questions are designed for students, competitive exam aspirants, and professionals preparing for NTS, PPSC, FPSC, CSS, PMS, PEC exams, university entry tests, and job interviews. Practice online with updated Engineering MCQs to strengthen concepts, improve technical knowledge, and perform better in exams and recruitment tests.

434. On-off control

A. Fully opens the final control element, when the measured variable is below the set point
B. Fully closes the final control element, when the measured variable is above the set point
C. Is a two position control (fully open or fully closed) control adequate to control a process with slow reaction and minimum dead time or transfer lag
D. None of these
✅ The correct answer is option C.