Engineering

Boost your preparation with the latest Engineering MCQs with answers and explanations. Our collection covers civil engineering, electrical engineering, mechanical engineering, electronics, software engineering, and other core subjects. These multiple-choice questions are designed for students, competitive exam aspirants, and professionals preparing for NTS, PPSC, FPSC, CSS, PMS, PEC exams, university entry tests, and job interviews. Practice online with updated Engineering MCQs to strengthen concepts, improve technical knowledge, and perform better in exams and recruitment tests.

1194. Floating control action

A. Moves the final control element at constant speed in either direction in response to an error signal
B. Changes the position of the final control element from on to off
C. Is used to counteract rapid load changes
D. None of these
✅ The correct answer is option A.