Prepare with the best Chemical Engineering MCQs with answers and detailed explanations for exams and job tests. Our collection covers key topics such as chemical process calculations, thermodynamics, fluid mechanics, heat transfer, mass transfer, reaction engineering, instrumentation, and plant design. These Chemical Engineering multiple-choice questions are ideal for students, competitive exam aspirants, and professionals preparing for NTS, PPSC, FPSC, PEC exams, GATE, university entry tests, and job interviews. Practice online with updated Chemical Engineering MCQs to strengthen your concepts and improve technical problem-solving skills.

4334. Pick out the wrong statement pertaining to the comparative evaluation of performance of the packed tower and the plate tower.

Plate tower is perferred, if interstage cooling is required to remove heats of reaction or solution.
Plate tower is preferred over packed tower, if the operation involves liquids containing dispersed solids.
The total weight of a dry plate tower is usually much more than that of a dry packed tower designed for the same duty.
In operations involving large temperature changes. (e.g. distillation), plate towers are preferred over packed towers as the packing may be crushed due to large temperature changes.
✅ The correct answer is option C.