HomeEngineeringIn a screw jack, the effort required to lower the load is __________ the effort required to raise the same load. 12310. In a screw jack, the effort required to lower the load is __________ the effort required to raise the same load.By Admin / September 13, 2025 less than equal to more than ✅ The correct answer is option A.
1. A fire tube boiler is limited to a maximum steam pressure of about __________ kg/cm². Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin
2. Transformer cores are normally made from Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin