50. A welded rail joint is generally A. Support on a sleeper B. Sipport on a metel C. Suspended D. None of These ✅ The correct answer is option C.
51. Best wood for wooden sleepers is A. Sal B. Teak C. Deodar D. Chir ✅ The correct answer is option B.
52. Wooden sleepers used on the girders of bridges, are generally made o A. Sal B. Teak C. Neem D. Deodar ✅ The correct answer is option B.
53. Rail section first designed on Indian Railways, was A. Double headed B. Bull headed C. Flat footed D. None of These ✅ The correct answer is option A.
54. In India the rails are manufactured by A. Open hearth process B. Duplex process C. Both A & B D. None of These ✅ The correct answer is option C.
55. Coal ash (or cinder) is used in initial stages of a new construction of railway for A. Wooden sleeper B. Steel sleeper C. Cast iron sleeper D. None of These ✅ The correct answer is option A.
37. Boxing of ballast is done A. Under the rail B. At the rail C. In between two rail D. In between two sleeper ✅ The correct answer is option B.
41. Mr. W. Simms, the consulting Engineer to the Government of India recommended the gauge for Indian railways A. 1.435 m as adopted in England B. 1.800 m as per Indian conditions C. 1.676 m as a compromise gauge D. 1.000 m as a standard gauge ✅ The correct answer is option C.
43. AEC stands for A. Accident Enquiry Committee B. Accident Enquiry Common C. Accident Enquiry Complen D. Accident Enquiry Count ✅ The correct answer is option A.
45. CTI stands for A. Central Training Institute B. Central Training India C. Central Training Impact D. Central Training Install ✅ The correct answer is option A.