[A]. 20 days
[B]. 22 1 days 2
[C]. 25 days
[D]. 30 days
✅ The correct answer is option B.
Ratio of times taken by A and B = 1 : 3.
Ratio of times taken by A and B = 1 : 3.
The time difference is (3 – 1) 2 days while B take 3 days and A takes 1 day.
If difference of time is 2 days, B takes 3 days.
If difference of time is 60 days, B takes
3
x 60
= 90 days.
2
So, A takes 30 days to do the work.
A’s 1 day’s work =
1
30
B’s 1 day’s work =
1
90
(A + B)’s 1 day’s work =
1
+
1
=
4
=
2
30
90
90
45
A and B together can do the work in
45
= 22
1
days.
2
2