[A]. 1 4
[B].1 10
[C].7 15
[D].8 15
✅ The correct answer is option D.
A’s 1 day’s work =
1
;
A’s 1 day’s work =
1
;
15
B’s 1 day’s work =
1
;
20
(A + B)’s 1 day’s work =
1
+
1
=
7
.
15
20
60
(A + B)’s 4 day’s work =
7
x 4
=
7
.
60
15
Therefore, Remaining work =
1 –
7
=
8
.
15
15