A. Reassign the jobs
B. Redesign the jobs
C. Reduce work hours
D. All of the above
✅ The correct answer is option D.
Reassign the jobs, Redesign the jobs and Reduce work hours are the options while planning for surplus.
Reassign the jobs, Redesign the jobs and Reduce work hours are the options while planning for surplus.