activity level costs
input level costs
batch level costs
output level costs
✅ The correct answer is C.
Costs of all activities for a group of products, rather than individual product can be classified as batch level costs. A batch-level cost is a cost related to a group of units, but which is not associated with specific individual units.
Costs of all activities for a group of products, rather than individual product can be classified as batch level costs. A batch-level cost is a cost related to a group of units, but which is not associated with specific individual units.