HomeEngineeringThe correct sequence of drilling equipment for increasing size of holes in tunnels is________________? 2769. The correct sequence of drilling equipment for increasing size of holes in tunnels is________________?By Admin / September 7, 2025 A. wagon drill, churn drill, shot drill B. wagon drill, shot drill, churn drill C. shot drill, churn drill, wagon drill D. churn drill, wagon drill, shot drill ✅ The correct answer is option A.