1214. As compared to wall type breakwater, mound type breakwater_________________?

A. requires skilled labour
B. requires low maintenance cost
C. requires less material
D. results in less damage due to gradual failure
✅ The correct answer is option D.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top