HomeEngineeringIf the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is_________________? 390. If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is_________________?By Admin / September 7, 2025 A. 100 cm B. 90 cm C. 80 cm D. 50 cm ✅ The correct answer is option A.
1. A fire tube boiler is limited to a maximum steam pressure of about __________ kg/cm². Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin
2. Transformer cores are normally made from Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin