HomeEngineeringAs per IS specifications, the maximum final setting time for ordinary Portland cement should be_______________? 132. As per IS specifications, the maximum final setting time for ordinary Portland cement should be_______________?By Admin / September 7, 2025 A. 30 minutes B. 1 hour C. 6 hours D. 10 hours ✅ The correct answer is option D.
1. A fire tube boiler is limited to a maximum steam pressure of about __________ kg/cm². Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin
2. Transformer cores are normally made from Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin