HomeEngineeringWhich of the following tests is not done for transformer oil ? 2737. Which of the following tests is not done for transformer oil ?By Admin / September 7, 2025 Flash point and acid value. Aniline point. Dielectric strength. Copper strip corrosion test. ✅ The correct answer is option B.
1. A fire tube boiler is limited to a maximum steam pressure of about __________ kg/cm². Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin
2. Transformer cores are normally made from Leave a Comment / Basic Chemical Engineering MCQs, Chemical Engineering, Engineering / By Admin